{"id":6421,"date":"2021-05-20T14:28:05","date_gmt":"2021-05-20T06:28:05","guid":{"rendered":"https:\/\/www.hoistdq.com\/?p=6421"},"modified":"2023-03-15T15:10:57","modified_gmt":"2023-03-15T07:10:57","slug":"1000kg-electric-chain-hoist-single-phase","status":"publish","type":"post","link":"https:\/\/www.hoistdq.com\/es\/1000kg-electric-chain-hoist-single-phase.html","title":{"rendered":"High Speed Single Phase Chain Hoist for Automotive Industry"},"content":{"rendered":"<h3>Problems:<\/h3>\n<p>The client comes from the new Automotive Industry, made an enquiry to a high speed single phase <em><a href=\"https:\/\/www.hoistdq.com\/es\/electric-chain-hoist-for-sale-low-price.html\/\">polipastos el\u00e9ctricos de cadena<\/a><\/em> to replace the failing wire rope hoists.<\/p>\n<p>The existing hoist units being used in client&#8217;s workshop were a low cost\/low duty wire rope design without a mechanical rope guide. The operators were performing up to fifteen cycles per hour in a very fast paced automotive manufacturing environment, which was causing the wire rope to spool on the hoist drum incorrectly and resulting in load slip and danger to the operators.<\/p>\n<p>In addition the inadequate hoist unit, top limit switches fitted to the existing <a href=\"https:\/\/www.hoistdq.com\/es\/electric-cable-hoist-and-electric-wire-rope-hoist\/\"><em><span class='wp_keywordlink'><a href=\"https:\/\/www.hoistdq.com\/es\/electric-wire-rope-hoist\/\" title=\"el\u00e9ctrico polipasto de cable\" target=\"_blank\">el\u00e9ctrico polipasto de cable<\/a><\/span><\/em><\/a> units were sometimes failing as the operators continually worked the hoist units up to the top limit switch position.<\/p>\n<h3>Solutions:<\/h3>\n<p>Our sales engineers checking the problems, very quickly re-assessed the lifting application requirements and specified that the application required a high speed single phase chain hoist with a SWL of up to 1000kg, having a high duty cycle, slipping clutch overload protection and a heavy duty top limit switch.<\/p>\n<p>The robust top limit switch fitted to this <span class='wp_keywordlink'><a href=\"https:\/\/www.hoistdq.com\/es\/electric-hoist-and-electrical-hoist\/\" title=\"el\u00e9ctrico polipasto El\u00e9ctrico, Polipasto El\u00e9ctrico de la gr\u00faa, Polipasto el\u00e9ctrico\" target=\"_blank\">el\u00e9ctrico de la gr\u00faa<\/a><\/span> unit as standard cuts off the power supply to the hoist motor when the operator engages the switch, this prevents a SWL overload situation\/safety clutch operation and shock loading of the load chain resulting in safe operation and prolongs the life of the chain hoist load chain.<\/p>\n<h3>Comentarios:<\/h3>\n<p>Our customer decided to order two trial units. After receiving the chain hoists and installation, with feedback from their operators that they felt much safer when using our <span class='wp_keywordlink'><a href=\"https:\/\/www.hoistdq.com\/es\/electric-chain-hoists\/\" title=\"polipastos el\u00e9ctricos de cadena, Polipastos El\u00e9ctricos de Cadena\" target=\"_blank\">polipastos el\u00e9ctricos de cadena<\/a><\/span>, while it was also recognized that due to the speed of the new hoists the timescale of the manufacturing process was reduced, resulting in up to a ten second improvement in the manufacturing process cycle time.<\/p>\n<p>Another order will coming soon according to our client&#8217;s feedback. Welcome to <a href=\"\/es\/sales@hoistdq.com\/\"><em>p\u00f3ngase en contacto con nosotros<\/em><\/a> for your special lifting application projects today.<\/p>\n<figure id=\"attachment_6422\" aria-describedby=\"caption-attachment-6422\" style=\"width: 700px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-6422\" src=\"https:\/\/www.hoistdq.com\/wp-content\/uploads\/1000kg-electric-chain-hoist-single-phase.jpg\" alt=\"single phase electric chain hoist 1000kg\" width=\"700\" height=\"500\" title=\"\" srcset=\"https:\/\/www.hoistdq.com\/wp-content\/uploads\/1000kg-electric-chain-hoist-single-phase.jpg 700w, https:\/\/www.hoistdq.com\/wp-content\/uploads\/1000kg-electric-chain-hoist-single-phase-300x214.jpg 300w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><figcaption id=\"caption-attachment-6422\" class=\"wp-caption-text\">single phase electric chain hoist 1000kg<\/figcaption><\/figure>\n<figure id=\"attachment_6423\" aria-describedby=\"caption-attachment-6423\" style=\"width: 700px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-6423\" src=\"https:\/\/www.hoistdq.com\/wp-content\/uploads\/1000kg-single-phase-electric-chain-hoist.jpg\" alt=\"Single phase electric chain hoist\" width=\"700\" height=\"500\" title=\"\" srcset=\"https:\/\/www.hoistdq.com\/wp-content\/uploads\/1000kg-single-phase-electric-chain-hoist.jpg 700w, https:\/\/www.hoistdq.com\/wp-content\/uploads\/1000kg-single-phase-electric-chain-hoist-300x214.jpg 300w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><figcaption id=\"caption-attachment-6423\" class=\"wp-caption-text\">Single phase electric chain hoist<\/figcaption><\/figure>","protected":false},"excerpt":{"rendered":"<p>Problems: The client comes from the new Automotive Industry, made an enquiry to a high speed single phase electric chain hoist to&#8230;<\/p>","protected":false},"author":1,"featured_media":6423,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"footnotes":""},"categories":[1110],"tags":[22,34,28,1027,1029,1028],"class_list":["post-6421","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cases","tag-chain-block","tag-chain-hoist","tag-electric-chain-hoist","tag-electric-chain-hoist-1000kg","tag-high-speed-chain-hoist","tag-single-phase-chain-hoist"],"taxonomy_info":{"category":[{"value":1110,"label":"cases"}],"post_tag":[{"value":22,"label":"chain block"},{"value":34,"label":"chain hoist"},{"value":28,"label":"electric chain hoist"},{"value":1027,"label":"electric chain hoist 1000kg"},{"value":1029,"label":"high speed chain hoist"},{"value":1028,"label":"single phase chain hoist"}]},"featured_image_src_large":["https:\/\/www.hoistdq.com\/wp-content\/uploads\/1000kg-single-phase-electric-chain-hoist.jpg",700,500,false],"author_info":{"display_name":"Dongqi Hoist and Crane","author_link":"https:\/\/www.hoistdq.com\/es\/author\/dongqicrane"},"comment_info":0,"category_info":[{"term_id":1110,"name":"cases","slug":"cases","term_group":0,"term_taxonomy_id":1110,"taxonomy":"category","description":"","parent":0,"count":212,"filter":"raw","cat_ID":1110,"category_count":212,"category_description":"","cat_name":"cases","category_nicename":"cases","category_parent":0}],"tag_info":[{"term_id":22,"name":"chain block","slug":"chain-block","term_group":0,"term_taxonomy_id":22,"taxonomy":"post_tag","description":"","parent":0,"count":41,"filter":"raw"},{"term_id":34,"name":"chain hoist","slug":"chain-hoist","term_group":0,"term_taxonomy_id":34,"taxonomy":"post_tag","description":"","parent":0,"count":86,"filter":"raw"},{"term_id":28,"name":"electric chain hoist","slug":"electric-chain-hoist","term_group":0,"term_taxonomy_id":28,"taxonomy":"post_tag","description":"","parent":0,"count":81,"filter":"raw"},{"term_id":1027,"name":"electric chain hoist 1000kg","slug":"electric-chain-hoist-1000kg","term_group":0,"term_taxonomy_id":1027,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1029,"name":"high speed chain hoist","slug":"high-speed-chain-hoist","term_group":0,"term_taxonomy_id":1029,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1028,"name":"single phase chain hoist","slug":"single-phase-chain-hoist","term_group":0,"term_taxonomy_id":1028,"taxonomy":"post_tag","description":"","parent":0,"count":2,"filter":"raw"}],"_links":{"self":[{"href":"https:\/\/www.hoistdq.com\/es\/wp-json\/wp\/v2\/posts\/6421","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hoistdq.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hoistdq.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hoistdq.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hoistdq.com\/es\/wp-json\/wp\/v2\/comments?post=6421"}],"version-history":[{"count":1,"href":"https:\/\/www.hoistdq.com\/es\/wp-json\/wp\/v2\/posts\/6421\/revisions"}],"predecessor-version":[{"id":6424,"href":"https:\/\/www.hoistdq.com\/es\/wp-json\/wp\/v2\/posts\/6421\/revisions\/6424"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hoistdq.com\/es\/wp-json\/wp\/v2\/media\/6423"}],"wp:attachment":[{"href":"https:\/\/www.hoistdq.com\/es\/wp-json\/wp\/v2\/media?parent=6421"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hoistdq.com\/es\/wp-json\/wp\/v2\/categories?post=6421"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hoistdq.com\/es\/wp-json\/wp\/v2\/tags?post=6421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}